New Homes in Connecticut











   The Schedule is a very important part of your new home process. In order to keep a smooth schedule, we are providing you with a rough guide to the construction process. This guide will serve as a reminder to you when items need to be finalized in order to help facilitate the construction of your home.

  • Plans/Review
  • Permits
  • Site – Clearing/Prep/Survey/Excavate
    • Inspection (Soil)
    • Footing (Inspection)
  • Pour Walls
    • Framing Ordered
    • Tar/Waterproof (Inspection)
    • Hatchway
  • Backfill and Rough Grade
    • Foundation As-Built Submitted to Town
    • Fireplace Selection
    • Plumbing Fixtures (Location)
    • Roof and Siding Selections
    • Window/Door Selection Finalized (Order)
    • Floor Type Finalized
    • Cabinet Location Finalized
  • Framing (Sill Inspection)
    • Interior Trim Ordered
    • Kitchen Selections Finalized (Ordered)
    • Plumbing Fixtures Finalized
    • Electrical Walk-Through/Customer
  • Roofing/Shingles (Installation)
  • Fireplace (Installation)
    • Sheetrock (Ordered)
    • Appliance Location Finalized
  • Rough Plumbing
  • Rough HVACR
  • Rough Electrical
    • Inspection (Framing and Rough)
    • Electrical Fixtures Finalized (Ordered)
  • Siding (Installation)
  • Floors Poured (Garage/Basement/Stoop)
  • Insulation (Inspection)
    • Paint (Color Selection)
    • Flooring Colors Finalized
    • Pre-Sheetrock Walk-Through/Customer
  • Sheetrock Installed/Taping/Sanding
    • Ceiling Finish Selection
  • Doors/Trim/Rails Installed
  • Paint
  • Flooring Installed (Excluding Carpet)
  • Kitchen Installed
    • Appliances Ordered
  • Finish Plumbing and Gas Line
  • Finish HVACR
  • Finish Electrical
  • Finish Grade
  • Gutters Installed
  • Miscellaneous Trim/Stairs/Hardwood
  • Preliminary Walk-Through
  • Carpet and CO Inspection
  • Landscaping
  • Final Touch Up Painting
  • Clean
  • Final Walk-Through